Skip to content

First day of installing the Shopbot

With the guidance of Vuild’s Tanaka, we put the Shopbot together. Assembling the foundation and lifting the gantry (which was super heavy!) were two of the tough spots of the process. After assembling it, we took some time making sure it was horizontal using a level.

And it ended up looking pretty good! We will turn it on tomorrow. Hoping that it will work!

Leave a Reply

Your email address will not be published. Required fields are marked *